News

Harvard Alumni Email Forwarding Services to Remain Unchanged Despite Student Protest

News

Democracy Center to Close, Leaving Progressive Cambridge Groups Scrambling

News

Harvard Student Government Approves PSC Petition for Referendum on Israel Divestment

News

Cambridge City Manager Yi-An Huang ’05 Elected Co-Chair of Metropolitan Mayors Coalition

News

Cambridge Residents Slam Council Proposal to Delay Bike Lane Construction

New Bridge to Soldiers Field.

NO WRITER ATTRIBUTED

A bill will be introduced in the State Senate tomorrow by Mr. D. W. Lane '94, providing for the erection of a new bridge over the Charles River at the end of Boylston street. The bridge contemplated will be a drawless structure of wood, sixty feet wide. The cost, which is estimated at $100,000, is to be divided equally between the cities of Boston and Cambridge. The height of the bridge over the channel will be twenty-six feet above mean high water, and will necessitate raising the present grade of the street.

Provided the bill passes the Legislature, work on the bridge will be begun early in the spring, and should be completed before next fall.

Want to keep up with breaking news? Subscribe to our email newsletter.

Tags